Abstract

Traditionally, tolerance allocation and scheduling have been dealt with separately in the literature. The aim of tolerance allocation is to minimize the tolerance cost. When scheduling the sequence of product operations, the goal is to minimize the makespan, mean flow time, machine idle time, and machine idle time cost. Calculations of manufacturing costs derived separately using tolerance allocation and scheduling separately will not be accurate. Hence, in this work, component tolerance was allocated by minimizing both the manufacturing cost (sum of the tolerance and quality loss cost) and the machine idle time cost, considering the product sequence. A genetic algorithm (GA) was developed for allocating the tolerance of the components and determining the best product sequence of the scheduling. To illustrate the effectiveness of the proposed method, the results are compared with those obtained with existing wheel mounting assembly discussed in the literature.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.