Abstract
Peripheral primitive neuroectodermal tumors (pPNETs) are rare and aggressive small round cell tumors, tending to occur in the thoracic and paravertebral soft tissues in children and young adults. This report describes an exceptionally rare case of concurrent delayed recurrence of pPNET in the orbital and sellar/suprasellar regions in an older adult, with a discussion supported by a literature review. We report an 82-year-old woman with a history of orbital pPNETs resection at age 62, followed by gamma knife radiosurgery for local recurrence at age 66. She presented left eye pain, left eye protrusion, decreased vision in the right eye, and right homonymous hemianopia. MRI revealed extensive lesions in the left orbital cavity and sellar/suprasellar region, contiguous through the optic canal. The recurrent tumor was treated through a two-stage resection via transcranial and transsphenoidal approaches, which resulted in symptom improvement and a pathologic diagnosis of pPNETs. This case highlights a highly rare instance of late-onset orbital pPNETs recurrence in an elderly patient, with evidence suggesting tumor progression into the sellar/suprasellar regions through the optic canal.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.