Transmission system in Serbia, due to its age, inevitably enters the period of active investment project of reconstruction, adaptation and rehabilitation of the transmission lines. Today we are faced with the fact that the transmission lines are constructed more than 60 years ago, and are still in service. The paper discusses the problems in the implementation of projects of rehabilitation of reinforced concrete transmission line route. The results of experimental research, load test of reinforced concrete poles are show. It explains the problems in the management of investment projects of rehabilitation in these lines. On the bases of analyzed opportunities and best practices all possible alternative sceneries are given for reinforced concrete poles of transmission lines in the network. Multidisciplinary comparison is made for these alternatives and presented the advantages and disadvantages of each variant. The analysis pointed to solution - application of steel lattice towers instead of reinforced concrete. Project management of rehabilitation and reconstruction of the transmission line in the coming period will be a great deal with which will meet the engineers. However, an even greater engineering challenge will be deciding on the proper manner and dynamics of realization of projects for each line.

Highlights

  • Transmission system in Serbia, due to its age, inevitably enters the period of active investment project of reconstruction, adaptation and rehabilitation of the transmission lines

  • Steel is brought the ideal ratio / price. This inevitably led to the extrusion of concrete poles from the high voltage network in sixties, some of the good qualities of concrete poles, like a small dimensions in bases of poles, steel lattice towers could not keep

  • In conditions in which the high-voltage grid operates in Serbia, there is the advantage that there is no possibility of theft of structure, which is an extraordinary problem in the case of steel lattice towers

Read more

Summary

Introduction

Transmission system in Serbia, due to its age, inevitably enters the period of active investment project of reconstruction, adaptation and rehabilitation of the transmission lines. CONDITION OF REINFORCED CONCRETE POLES IN TRANSMISSION LINE GRID It is a large number of lines with concrete poles, since the fifties and sixties of the last century was a period of expansive development of the transmission system in the country.

Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.