Abstract

The traditional supply chain network planning problem is stated as a multi-period resource allocation model involving 0–1 discrete strategic decision variables. The MIP structure of this problem makes it fairly intractable for practical applications, which involve multiple products, factories, warehouses and distribution centres (DCs). The same problem formulated and studied under uncertainty makes it even more intractable. In this paper we consider two related modelling approaches and solution techniques addressing this issue. The first involves scenario analysis of solutions to “wait and see” models and the second involves a two-stage integer stochastic programming (ISP) representation and solution of the same problem. We show how the results from the former can be used in the solution of the latter model. We also give some computational results based on serial and parallel implementations of the algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.