Abstract

The PQ-WHO Certification (Pra Qualification) is a standard covers requirements of product quality, processes, systems, safety, and health services in pharmaceutical industries related to HIV disease, reproductive disorders and acute diarrhea of children. The PQ-WHO released by the World Health Organization. A Pharmaceutical company that meet the WHO PQ requirements deserves to apply for getting approval, certification and recognition in the production of drugs. This paper described how to overcame the gap between the ideal conditions according to PQ-WHO requirements and the actual implementation. Action plan carried out to met PQ-WHO requirements by the scheduling of job method. The results of research in a pharmaceutical industry in Bekasi showed that the improvement to met PQ-WHO requirements fulfillment mostly effective done by method of Shortest Process Time (SPT) compared to other method. It resulted the shortest average time of work completion, highest utilization rate, and lowest delay. Mean flow time about 70.09 days (90 days available), average delay about 14.57 days, and tardy jobs by 7 times, and utilization about 11.96%. This result is best compared to other methods.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call