Abstract

A mature emergency system is the premise to ensure emergency planning to be performed perfectly. Aimed at the six emergency management goals, the challenge caused by risk potential and contribution caused by emergency competence formed by emergency system are calculated separately. The emergency system is viewed as mature when the emergency competence can encounter the risk potential effectively. The completeness assessment method is used in a petrochemical reservoir. The engineering application indicates that the evaluation results can reflect the general condition and the shortcomings of the emergency system. The advices given to the depot can help the safety manager to take some pointed measures to improve the emergency system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.