Abstract

We consider a scheduling environment with m (m ≥ 1) identical machines in parallel and two agents. Agent A is responsible for n1 jobs and has a given objective function with regard to these jobs; agent B is responsible for n2 jobs and has an objective function that may be either the same or different from the one of agent A. The problem is to find a schedule for the n1 + n2 jobs that minimizes the objective of agent A (with regard to his n1 jobs) while keeping the objective of agent B (with regard to his n2 jobs) below or at a fixed level Q. The special case with a single machine has recently been considered in the literature, and a variety of results have been obtained for two-agent models with objectives such as fmax, ∑ wjCj, and ∑ Uj. In this paper, we generalize these results and solve one of the problems that had remained open. Furthermore, we enlarge the framework for the two-agent scheduling problem by including the total tardiness objective, allowing for preemptions, and considering jobs with different release dates; we consider also identical machines in parallel. We furthermore establish the relationships between two-agent scheduling problems and other areas within the scheduling field, namely rescheduling and scheduling subject to availability constraints.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call