Abstract

The hydropower unit commitment (HUC) is often indirectly considered by combining individual units in a hydropower plant into a plant-based generator to alleviate the dimensional difficulty in short-term hydropower scheduling of cascaded reservoirs. This work presents three procedures to combine operating zones of units in a hydropower plant into the plant-based operating zones, including an exhaustive method (M01) that enumerates all the possible combinations, a discrete method (M03) that investigates discrete values to see if they are in an operating zone, and a bound oriented method (M04) that explores new operating zones with an optimization solver. The procedures are compared with a previous one (M02) that merges the operating zones of a unit one by one in order. The experiments of the methods in 11 case studies involving a variety of hydropower plants reveal that the second method (M02) should always be recommended due to its strength, which is even more prominent than any other methods in dealing with large-scale problems, and errors occur when using interpolation to estimate the plant-based operating zones at a water head between two sampling water heads.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call