Abstract
The Gerede Tunnel is a large inter-basin project in Turkey. As with many long tunnels, some of the predictions in the project report and the tender contract have not been realized. Completion of the tunnel has been delayed for more than twice the time given in the tender contract. Unexpectedly complex geological–tectonic–hydrogeological conditions and the selection of tunnel-boring machines (TBMs) are the main reasons for this long delay. There were some discrepancies between the predicted and actual geology. The groundwater pressure encountered was much higher than expected. Plastic clays in the limestone and breccia and loose agglomerates with a high water pressure in the faults decreased the advance rate and led to several long stoppages. One of the three double-shield TBMs became stuck in the tunnel and could not be recovered. The last quarter of the tunnel was excavated more slowly, but without severe problems, by a modified earth pressure balance shield TBM. As a result, the TBM type, drive direction, length, route, cost and completion date of the Gerede Tunnel have all changed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Quarterly Journal of Engineering Geology and Hydrogeology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.