Abstract

In Turkey, for the preliminary construction cost estimation, a notice, which is updated and published annu­ally by Turkish Ministry of the Environment and Urbanism, known as “unit area cost method” (UACM) is generally employed. However, it’s known that the costs obtained through this method in which only construction area is taken into consideration have significant differences from actual costs. The aim of this study is to compare the cost estimations obtained through “multi layer perceptron” (MLP) and “radial basis function” (RBF), which are commonly used artificial neural network (ANN) methods. The results of MLP and RBF were also compared with the results of UACM and the validity of UACM was interpreted. Dataobtained from 232 public construction projects, which completed between 2003 and 2011 in different regions of Turkey, were reviewed. Consequently, estimated costs obtained from RBF were found to be higher than the actual costs with a 0.28% variance, while the estimated costs obtained from MLP were higher than actual values with a 1.11% variance. The approximate costs obtained from UACM are higher than actual costs with a 28.73% variance. It was found that both ANN methods were showed better performance than the UACM but RBF was superior to MLP.

Highlights

  • At the present time, construction process has been modified with the affect of technological developments on construction sector and more qualified buildings are constructed (Uğur 2007a)

  • It’s clear that actual cost data and approximate cost data, which were obtained through unit area cost method” (UACM), had significant differences

  • Principally unit area cost method (UACM), which is commonly used in Turkey, was dealt with and the approximate cost of each construction work was calculated in accordance with this method

Read more

Summary

Introduction

Construction process has been modified with the affect of technological developments on construction sector and more qualified buildings are constructed (Uğur 2007a). In Turkey, for the cost estimation during predesign stage, “the Notice Concerning the Approximate Construction Unit Costs to Be Used While Calculating the Service Charge of Architecture and Engineering”, which is updated and published annually by Turkish Ministry of Environment and Urbanism, known as “unit area cost method” (UACM) is generally employed. In this method, approximate cost is obtained by multiplying the total construction area of a building and the construction cost of the unit area for the building according to the construction class of the notice. Input parameters of the ANN model were considered as; function of construction, bearing system, functional area, building

Objectives
Methods
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.