Abstract

BDS (BeiDou Navigation Satellite System) ground tracking stations are equipped with high accuracy atomic clocks, and they are synchronized with the BDS time scale (BDT) via the Precise Orbit Determination (POD) processing. During the periods of satellite maneuver and post-maneuver, station clocks are kept fixed as known values in the POD processing. To improve the real-time POD capability, station clocks need to be predicted. In this paper, the performance of three clock prediction models is evaluated, including quadratic polynomial model (QP), periodical term model (PM), and grey model (GM). The precision of clock fitting and prediction, as well as the performance of the prediction models in POD are compared. Data of six stations are used for test, and the results show that: the mean fitting accuracy of quadratic polynomial model, periodical term model, and grey model is 0.14ns, 0.05ns, 0.27ns, respectively; the 1h and 2h prediction precision of the three models is 1.17ns, 0.88ns, 1.28ns, and 2.72ns, 2.09ns, 2.53ns, respectively. Applying the 1h and 2h predicted station clocks in the POD, the 3D orbit accuracy reaches the best using the periodical term model, while the radial accuracy of satellite orbit is rather close for the three models with the difference within 3cm.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call