Abstract

Part II of this study aims to provide detailed, diagnostic information about the complexity difference between conventional and digital main control rooms (MCRs) in nuclear power plants. Complexity factors were classified according to task components and complexity dimensions. The effects of operator experience and plant type on complexity factors were statistically analyzed from three levels, i.e., task components, complexity dimensions, and individual factors. Interface management complexity factors were compared with other factors in digital MCRs. The results suggest that generally operator experience had effects on several task components and complexity dimensions only in abnormal/emergency situations. Plant type affected several task component and complexity dimensions in both abnormal/emergency and normal situations. Complexity factors in the affected task components and complexity dimensions had higher frequency, complexity, or impact in digital MCRs than those in conventional MCRs. Factors related to crew activity and the dimensions of overabundance, temporal demand, and variability had relatively high frequency, complexity, or impact. Compared with other factors, interface management complexity factors had marginally higher frequency, but significantly lower complexity and impact. Relevance to industryThis study quantitatively addresses the complexity difference between conventional and digital MCRs in detail. It may provide rich information for how to improve operator working environments in NPPs. It may also contribute to other applied domains, such as human reliability analysis and interface design.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call