Abstract

According to the Yuzhou Tunnel of Chongqing Airport Road in-situ expansion project under the IV and V class surrounding rock, this paper compares the construction mechanism among the three construction methods which can be used in the project. The results based on the construction mechanism analysis under different construction methods show that, it’s suitable to use bench method in the IV class surrounding rock and backfill method in the V class surrounding rock.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.