Abstract
ABSTRACT Dilution effects should be considered in the estimated model of deposit due to its significant impact on feasibility studies, mine planning and scheduling, milling, and stockpiling. This work compares the capacity of two approaches for modelling dilution of intrusive barren dykes into the ore body in a copper deposit. Two approaches were used to generate an undiluted model of copper grade in a copper deposit, which is cross cut by intrusive dykes. The results demonstrated that the second approach is more advantageous in comparison with the first approach, especially when there is hard contact between the ore and barren dykes.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Mining, Reclamation and Environment
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.