Abstract
Henosepilachna vigintioctomaculata is distributed in several Asian countries. The larvae and adults often cause substantial economic losses to Solanaceae crops such as potato, tomato, eggplant, and Chinese boxthorn. Even though a chromosome-level genome has been documented, the expression profiles of genes involved in development are not determined. In this study, we constructed embryonic, larval, pupal, and adult transcriptomes, generated a comprehensive RNA-sequencing dataset including ~52 Gb of clean data, and identified 602,773,686 cleaned reads and 33,269 unigenes. A total of 18,192 unigenes were successfully annotated against NCBI nonredundant protein sequences, Swissprot, Eukaryotic Orthologous Groups, Gene Ontology (GO), or Kyoto Encyclopedia of Genes and Genomes (KEGG) databases. There were 3580, 2040, 5160, 2496, 3008, and 3895 differentially expressed genes (DEGs) between adult/egg, egg/larval, larval/pupal, adult/pupal, egg/pupal, and adult/larval samples, respectively. GO and KEGG analyses of the DEGs highlighted several critical pathways associated with specific developing stages. This is the first comprehensive transcriptomic dataset encompassing all developmental stages in H. vigintioctomaculata. Our data may facilitate the exploitation of gene targets for pest control and can serve as a valuable gene resource for future molecular investigations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have