Abstract

By introducing and comparing the commonly used economic benefit evaluation methods for power transmission and transformation construction projects under the Design and Build(DB) mode, the paper investigates which method should be used for different purposes of economic benefit evaluation. On this basis, the advantages and disadvantages of these methods and their application conditions have been discussed in depth so as to provide useful references for the economic evaluation work.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.