Abstract

Private Finance Initiative (PFI) has been used on many projects in the UK in the delivery of public services. Cost, time and risk performance in public projects was anticipated to be improved by the superior skills of the private sector. So far, there are limited empirical studies on the life cycle performance of PFI projects, especially performance comparison between different sectors. This study investigated and compared variations in costs, time, and client requirements tracking it through the strategic business case stage to the operational phase in healthcare and transport sectors. It explored the influence of sector-specific factors, project size and maturity of the PFI on these variations. It used documentary analysis of full business cases of five PFI projects and a questionnaire survey of 44 PFI projects in the UK. The findings reveal that there are still considerable cost and time overruns and requirement changes in PFI projects in both sectors over the development of the project and its early use. The health sector was better than the transport sector for time overruns but was worse on costs. Smaller-value projects outperformed larger projects on cost variations but underperformed on time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.