Abstract

INCREASING and expanding electrification has further stimulated debate on the comparative benefits of overhead (OH) versus underground (UG) power distribution. This analysis investigates the distinction in the potential environmental burdens between the full life cycles of OH and UG primary power distribution systems including their installation, maintenance, and decommissioning. The results will be drawn from a cradle-to-grave Life Cycle Assessment (LCA) of each distribution method in the largest electricity service area in California - Southern California Edison's (SCE).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.