Abstract
In this paper we consider a production plan optimization problem for a company that produces textile products. The problem is solved using two iterative methods: a new method based on the cooperative game theory (MP method) and the well-known STEM method. Their application efficiency and the solutions obtained are compared. For this purpose we use four groups of criteria: (1) the general characteristics of the method (2) the criteria from the standpoint of the decision makers, (3) the criteria from the perspective of the analysts, and (4) the ‘economic’ criteria. The analysis indicates that both methods are highly efficient for solving this kind of production plan optimization problems. However, the decision-makers preferred the MP method.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have