Abstract
Large-scale parallel systems, Multiprocessors System-on-Chip (MP-SoCs), multicomputers, and cluster computers are often composed of hundreds or thousands of components (such as routers, channels and connectors) that collectively possess failure rates higher than what arise in the ordinary systems. One of the most important issues in the design of such systems is the development of the efficient fault-tolerant mechanisms that provide high throughput and low latency in communications to ensure that these systems will keep running in a degraded mode until the faulty components are repaired. Pipelined Circuit Switching (PCS) has been suggested as an efficient switching method for supporting inter-processor communications in networks due to its ability to preserve both communication performance and fault-tolerant demands in such systems. This paper presents a new mathematical model to investigate the effects of failures and capture the mean message latency in torus using PCS in the presence of faulty components. Simulation experiments confirm that the analytical model exhibits a good degree of accuracy under different working conditions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.