Abstract
In recent years, with the State Grid Corporation's vigorous construction of smart grids, smart meters have been rapidly promoted in the power system. After several years of online operation, the operating reliability of smart meters has also stabilized. However, in the process of widespread use of smart electric energy meters, the quality problems of clock chips, batteries and other components have also been exposed. This article takes the component failures encountered in the detection and operation of the smart electric energy meter as an example, analyzes the causes of the failures based on the four typical abnormal phenomena, and then conducts the opening detection for the above reasons and determines the nature of the failure based on the test conclusions. Finally, a corresponding fault management platform is established through the collection of electric energy meter fault data, which realizes all-round management and control of the fault handling process and selection of the qualifications of smart meter suppliers, thereby ensuring the quality of components and improving the operation of smart electric meters reliability.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have