Abstract

Pumped hydro storage (PHS) systems which are located at isolated regions and are able to exploit the rejected wind energy amounts produced by local wind farms, seem to gain interest worldwide and to become essential in regard to higher shares of renewable-generated electricity. Despite the high wind potential encountered in many Greek island regions, the wind energy contribution to the electrification of these areas is significantly restricted due to imposed electrical grid limitations. In this context, the current work examines the economic viability of a wind-based PHS system (wind-hydro solution) which provides the local electrical grid of an Aegean Sea island, Lesbos, with guaranteed energy amounts during the peak load demand periods. Based on the maximization of the project’s net present value, the optimum system configuration is proposed while many other feasible solutions are revealed. According to the results obtained the implementation of this project demonstrates excellent technical and economic performance, while at the same time renewable energy sources (RES) contribution is doubled reaching almost 20% of the Lesbos island electrical energy consumption.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.