Abstract

The potential to optimize wastewater utilization, whilst achieving satisfactory nutrient removal has been investigated through a simple system combining an Artificial Wetland with a High Rate Algal Pond (HRAP). Receiving septic sewage at a surface loading equivalent to 13.5 cm/day the Wetland achieved COD removals of 59.2%, NH4–N of 34.6%, PO4-P of 31.9% and SS of 78%. The HRAP selectively cultivated an easily harvestable filamentous green alga through a combination of short hydraulic residence times (<3 days), and microscreens as selectors over the effluent stream. Passage of the effluent through this stage permitted COD removal to increase to 79.4%, NH4-N to 82.8% and PO4-P to 54.1%, whilst generating a highly proteinaceous (42% by wt) biomass at a rate of approximately 50 tons/hectare/year. This paper discusses the performance of the pilot scale facility over a twelve month period, identifying biological and operational influences on the system, and the physiological mechanics by which the wastewater treatment is accomplished.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.