Abstract

The potential to optimize wastewater utilization, whilst achieving satisfactory nutrient removal has been investigated through a simple system combining an Artificial Wetland with a High Rate Algal Pond (HRAP). Receiving septic sewage at a surface loading equivalent to 13.5 cm/day the Wetland achieved COD removals of 59.2%, NH4−N of 34,6%, PO4−P of 31.9% and SS of 78%. The HRAP selectively cultivated an easily harvestable filamentous green alga through a combination of short hydraulic residence times (< days), and microscreens as selectors over the effluent stream. Passage of the effluent through this stage permitted COD removal to increase to 79.4%, NH4−N to 82.8% and PO4−P to 54.1%, whilst generating a highly proteinaceous (42% by wt) biomass at a rate of approximately 50 tons/hectare/year. This paper discusses the performance of the pilot scale facility over a twelve month period, identifying biological and operational influences on the system, and the physiological mechanics by which the wastewater treatment is accomplished.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call