Abstract

An appropriate scheduling system is needed in manufacturing activities to minimize production time and costs. Flow shop is one type of production flow that widely used in manufacturing. Based on the demand criteria, it has been known as a scheduling problem called closed shop. This scheduling emphasizes the make-to-stock (MTS) which produces a stock. We take the closed shop scheduling case studies from an existing literature and optimize scheduling using max-plus automata optimum. We compare the result with regular scheduling and the previous result in the literature. We show that the result of max-plus automata optimum scheduling are optimum compared than the existing regular scheduling and the existing previous result of the literature.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.