Abstract
The recent history of Australia's National Electricity Market (NEM) from 2012 to 2016 was characterised by coal plant closures, tightening domestic gas market and sharply rising electricity prices. The supply-side response that followed from 2016 to 2021 could only be described as an investment supercycle – 16,000 MW of plant commitments comprising $26.5 billion across 135 (mostly) Variable Renewable Energy (VRE) projects. We examine causes and the effects of the supercycle. Underlying causes included disorderly plant exit and climate change policy discontinuity in prior periods. Adverse effects in the post-entry environment included connection lags, system strength-related VRE production constraints, ex-post remediation costs, system frequency careering outside normal operating bands, and rising system operator interventions. Market institutions were caught out and subsequently focused on market re-design and resource adequacy reforms. Yet analysis contained in this article reveals the NEM's most pressing problems relate to real-time power system security, not fundamental market design or resource adequacy issues. Resolution requires the establishment of ‘missing markets’ (i.e. fast frequency, additional operating reserves, ramping, system strength and inertia), and urgently, to restore power system resilience. Key insights for other jurisdictions are climate change policy continuity and policies which serve to defuse the risk of disorderly coal plant exit.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.