Abstract

With the rapid development of China’s society and the implementation of the Belt and Road policy in recent years, many large-scale complex steel structure bridges are constructed, typically represented by the Hangzhou Bay Sea-Crossing Bridge and the Hong Kong-Zhuhai-Macao Bridge. In this paper, the checking calculation for the overall force of the steel box girder during construction is studied. The analysis shows that the steel box girder concerned has good stiffness and ductility.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.