Abstract

This chapter discusses shield tunnelling and segment assembling technologies. First, the tunnelling technologies are presented for EPB and slurry shield tunnelling, including determination of tunnelling parameters, pressure balance control, and tunnelling mode. Then segment transport and assembling are discussed, followed by the technologies for opening the chamber and replacing scrapers and construction of connection tunnels. Monitoring for shield tunnelling is also discussed. Finally, construction techniques for shield tunnelling with special conditions are presented with some examples.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.