Abstract

Commissioning shall start from the point at which steps are taken to bring the unit/facility up to operating pressure and temperature and to cut in the feed. It shall be complete when the unit/facility is operating at design capacity and producing products to specification. This chapter covers the minimum process requirements for plant start-up sequences and general commissioning procedures for non-licensed units or facilities. Although the start-up sequences and commissioning procedures differ to some extent from process to process, the basic philosophy and general aspects shall conform to the concepts of this chapter. In addition, this chapter is intended for convenience of use and pattern of follow-up and also as guidance. This also indicates the check points to be considered by the process engineers for assurance of fulfilment of prerequisites at any stage in the implementation of the process plant start-up and commissioning.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call