Abstract

Compared to Seasonal Line Rating (SLR), Dynamic Line Rating (DLR) allows for higher power flows on overhead transmission lines, depending on the actual weather conditions. Nevertheless, the potential of DLR has to be traded off against the additional uncertainty associated with varying ratings. This paper proposes a DC-Optimal Power Flow (DCOPF) algorithm that accounts for DLR uncertainty by means of Chance-Constraints (CC). The goal is to determine the optimal day-ahead dispatch taking the cost of reserve procurement into account. The key contribution of this paper consists in considering both non-parametric predictive distributions of DLR and the combined wind power uncertainty in the optimization problem. Our results highlight the benefits of DLR in wind-dominated power systems, assuming typical risk aversion levels in the line rating estimation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.