Abstract

The European Spallation Source (ESS) is a neutron-scattering facility being built with extensive international collaboration in Lund, Sweden. The world’s most powerful linear proton accelerator shoots protons against a rotating tungsten target where neutrons are knocked off (“spallate”) and are guided to the neutron instrument suites [1]. Three cryogenic plants and a vast cryogenic distribution system serve the cooling needs of the superconducting RF cavities in the accelerator, the cold hydrogen moderators in the target, a cryomodule test stand and the sample environments for neutron instruments. The project’s demand of schedule and economic feasibility requires a high degree of parallel work for installation and commissioning of the cryogenic and auxiliary systems. The resulting challenges in aspects such as safety, interface control, utility management and planning for the phases of installation and pre-commissioning shall be discussed in this paper. The current status of the ESS cryogenic system and lessons learned are addressed as well.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.