Abstract
A long period of development in Haituozi exploration area, downhole conditions are constantly changing, increasingly complex, and the original cementing technology is difficult to solve the region's low pressure leakage problems. For the special circumstances of the region, we set up a special research team, focus on starting from the the preferred cement slurry system, and improve stability, toughness, plugging, leak-proof ability of the slurry system performance; Another optimization cementing design and perfect cementing supporting measures effectively solve the region's dropout problem.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have