Abstract

A compacted sand and gravel fill, stabilized with cement, was used to provide an economical foundation under a portion of the outlet works conduit at Cochiti Dam in north central New Mexico. Based on results of tests a cement stabilized fill with a 28-day compressive strength of 1,000 psi was considered an adequate foundation for the conduit. The test results are presented herein.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.