Abstract
The basic concepts and characteristics of CCHP system and the configuration scheme of the system are introduced in this paper. On this basis, in this paper, it uses the operating mode of the combination method of power decided by heat and heat decided by power, and establishes a linear programming model that makes total year’s costs as optimize targets. Using LINGO software, it has got the result of simulation and calculation with the architecture’s dynamic load, and has got the architecture’s annual hourly distributed data of cold, heat and electricity load, and got the best equipment configuration and operating strategy, and got to evaluate the optimize results of energy efficiency and economy.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have