Abstract

Shortage and delay in materials supply is argued to be one of the most important factors that lead to delay in construction project delivery globally. However, the relevant underlying reasons vary from country to country. As such, this paper summarises the outcomes of a study that targeted identifying causes of shortage and delay in materials supply in Brunei Darussalam. The study was conducted through fifteen semi-structured interviews of contractors and materials suppliers in Brunei. The study identified six causes of shortageof materials and nine causes of delay in materials supply in Brunei. The most importantcausefor shortage of materials relates to the origin or availability of construction materials. On the other hand, the most influential cause of delay in material supply was found to be poor materials procurement and inventory management system, which has other underlying reasons such as late identification of the type of materials needed. The observations are expected to help in formulating or reviewing relevant policies, in order to ensure on-time project delivery.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.