Abstract

In the process of shield tunneling, there is a risk of cracks and diseases caused by geological changes, construction process, design and other factors, and leads to the construction process and even engineering accidents. This paper analyzes the cracks on the top of the segment under the geological conditions of deep burial and high water pressure by analyzing the cracks of a traffic rail project in Shenzhen, and analyzes the reasons for the cracks under normal construction. Based on the conventional stress model of segment and the screening of surrounding geological and hydrological conditions, the model assumption of local stress of integral segment is made, and the modified idiom and beam method are adopted- The results show that under the geological condition of fractured water stratum, the sudden change of water pressure caused by rainstorm and the joint action of broken rock block and segment floating will lead to the reduction of segment top space and direct contact with rock stratum, which will exceed the normal pressure range of segment and lead to cracks in the top segment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.