Abstract

In response to a recent 500kV line shunt reactor high-voltage bushing failure event in a station, This article examines and analyzes the objects and protection actions after the casing is disassembled. It was found that the cause of the casing failure was caused by the arc igniting the insulating oil in the casing after the main insulation of the casing was discharged. Finally, corresponding preventive measures are proposed from the perspective of on-site operation and maintenance.