Abstract

The atmosphere&vacuum-catalytic cracking integrated unit of a petrochemical enterprise in Hangzhou can not be tested for continuously producing 35 sets of pressure vessels. This thesis assesses the three main parameters (probability of failure, failure result and risk of failure probability and result) of the system through FBI technology, analyzes the potential failure mode and probability in this system and confirms the risk of failure via calculating failure result. This thesis shows the testing strategy suitable for this device based on failure mode, failure probability and result and puts forward scientific and proper testing cycle based on risk level of equipment to ensure the depth and rationality of overdue testing work and improve the reliability of safe and stable operation of device for the system before the next maintenance cycle.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.