Abstract

Abstract The objective of this paper is to explore a multidisciplinary problem-solving team investigating a customer-reported failure using an Ishikawa diagram with a spreadsheet for prioritizing and tracking investigation actions in a manufacturing organization. A case study methodology is used with the actions taken to investigate a customer-reported failure explained. The highest priority failure hypothesis was found to be unrelated to the failure. Two medium-rated hypotheses were found to be causing the problem; leakage was occurring at the connection between two components due to a diameter deviation of one of the components. Identifying and prioritizing hypotheses from the Ishikawa diagram provided structure to the investigation and gave the investigation team leader a tool for tracking the investigation actions. This approach is suitable for all types of failure investigations in which an Ishikawa diagram is used to list hypotheses.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call