Abstract

Abstract In a multi-energy building energy system, the key to improve the energy efficiency and economy is coordinating the capacity configuration and operation scheduling of both electrical and thermal energy storage. Considering the electricity storage characteristics of electricity feedback arbitrage and degradation, as well as part load rate and ON/OFF time constraints for the combined operation of thermal energy storage and ground source heat pump, this paper presents a bi-level optimization method, including upper capacity optimization and lower operation optimization. The simulation results show that, compared to the system without energy storage, the proposed method significantly reduces total annualized cost, shifts large amounts of peak load and increases renewable energy self-consumption rate.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.