Abstract

This study aims to predict ground surface settlement due to shallow tunneling and introduce the most affecting parameters on this phenomenon. Based on data collected from Shanghai LRT Line 2 project undertaken by TBM-EPB method, this research has considered the tunnel’s geometric, strength, and operational factors as the dependent variables. At first, multiple regression (MR) method was used to propose equations based on various parameters. The results indicated the dependency of surface settlement on many parameters so that the interactions among different parameters make it impossible to use MR method as it leads to equations of poor accuracy. As such, adaptive neuro-fuzzy inference system (ANFIS), was used to evaluate its capabilities in terms of predicting surface settlement. Among generated ANFIS models, the model with all input parameters considered produced the best prediction, so as its associated R2 in the test phase was obtained to be 0.957. The equations and models in which operational factors were taken into consideration gave better prediction results indicating larger relative effect of such factors. For sensitivity analysis of ANFIS model, cosine amplitude method (CAM) was employed; among other dependent variables, fill factor of grouting (n) and grouting pressure (P) were identified as the most affecting parameters.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call