Abstract

During their lifespan all the primary equipment installed in power system is subjected to transients. Therefore, it is necessary to adequately dimension and protect the equipment. However, in the networks with high share of renewables, power electronics, cables or near GIS, the failure can occur even though good practice of insulation coordination are fulfilled.
 In this paper high frequency power transformer model is presented. Such model is based on measurements of admittance matrix and is adequate for simulation of fast front transient in EMTP like software. Additionally, simulations of lightning and switching overvoltages are given for the observed power transformer unit.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call