Abstract
In the electromechanical design of highway tunnels, the calculation of voltage drop during fan start-up is an important part of electrical design, which is related to the safe operation of the whole system, green and energy-saving. The voltage drop involves the setting of substations, and ultimately affects the tunnel engineering scheme. In this study, a theoretical analysis, by calculating the voltage drop when the axial-flow fan starts was implemented. The method was used to calculate and verify the Milashan tunnel section of the 318 National Highway from Linzhi to Lhasa. The method can provide reference for peer designer in similar electromechanical design.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.