Abstract

The essential points of interesting technical matters concerning the design of POF cable and accessories and its installation for Grand Coulee Dam in U.S.A. are discussed. Such difficult problems as extra high oil pressure in lower side pothead, oil drainage from cable, high cable pull tension and cable sliding down were all derived from the high elevation difference and successfully solved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call