Abstract

The energy release and depressurization method is often used for the hidden cavity with extra big mass and high pressure in a tunnel. It is critical to determine the minimal depth of safe overburden for the release hole at lower position and the pressure at high position to be released. According to actual data collected from a cavity of Maluqing tunnel of Hubei, this paper performs the computer simulation and analysis for the safety of the release hole at lower position in the cavity and determines the critical safe depth to disclose the cavity is determined tentatively by using the finite differential software of FLAC3D. The simulated results in accord well with the actual situation show the rationality and validity of this numerical simulation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.