Abstract

Bundled generation and transmission expansion planning (BGTEP) aims to solve problems related to ascendant demand of power systems. A BGTEP model is considered in this paper and the optimal planning for a long-term period is obtained such that the cost of installation and operation would be minimized. Also, due to the recent orientation toward renewable energy sources, the influence of wind farms is involved in the methodology. An important aspect of load and wind power is their uncertain nature and the characteristic of being unforeseen. This matter is under consideration by a bounded and symmetric uncertainty optimization approach. In fact, the combination of two uncertainty methods, i.e., robust and stochastic optimization approaches are utilized and formulated in this paper. Besides, to cope with this uncertainty, Weibull distribution (WD) is considered as wind distribution, while load distribution is counted by a normal distribution (ND). A unique approximation approach for WD to be considered as ND is presented. In addition, a linear formulation is obtained by alternative constraints in order to drastically reduce the level of complexity of the formulation. Accordingly, a mixed-integer linear programming formulation is proposed to solve the BGTEP problem. The modified 6-bus and IEEE 24-bus RTS test systems are used to prove the applicability of the proposed method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.