Abstract

The BSR operated at an average power level of 1,821 kW for 39.82 percent of the time during April, May, and June. Water-quality control in both the reactor primary and secondary cooling systems was satisfactory. The BSR was operated at low and variable power during this quarter for 91.517 hours as part of the training programs for nuclear reactor operator trainees from Memphis State University and nuclear engineering students from the University of Tennessee. The PCA was also used in the above-mentioned training programs and was operated on twelve occasions when Central Florida Community College, the University of Kentucky, and Memphis State University students actively participated in training laboratories.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.