Abstract

The BSR operated at an average power level of 1,722 kw for 37.10 percent of the time during April, May, and June. Water-quality control in both the reactor primary and secondary cooling systems was satisfactory. The BSR was operated at low and variable power during this quarter for 91.566 hours as part of the training programs for nuclear engineering students from the University of Tennessee and Mississippi State University. The PCA was also used in the above- mentioned training programs and was operated on seven occasions when the University of Kentucky or Mississippi State University students actively participated in training laboratories. (auth)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.