Abstract

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main method which is used to resolve the claims in the construction project in Iraq. Finally, the proposed claims management system is developed to control the causes of the claims during the preconstruction phase and construction phase.

Highlights

  • Today, projects of construction are the subject of more claims than in any other time

  • Claims in construction project are considered by participants of the project to be one of the most unmanageable and unpleasant events of a project (Ho and Liu 2004)

  • The main objectives of this study is to identify the characteristics of claims building projects in Iraq including ; types, causes, impacts and Proposing an efficient system for managing claims in building projects in Iraq

Read more

Summary

Introduction

Projects of construction are the subject of more claims than in any other time. The high competition has forced contractors to bid projects with minimum profits in order to stay in business. In addition to their multiparty nature the projects are becoming more complex and risky. Claims commonly arise between the parties to construction contracts (owner, consultant, and contractor). Claims in construction project are considered by participants of the project to be one of the most unmanageable and unpleasant events of a project (Ho and Liu 2004). This can be caused a many problems such as; delays, changes, unforeseen circumstances, insufficient information, and conflicts. The main objectives of this study is to identify the characteristics of claims building projects in Iraq including ; types , causes, impacts and Proposing an efficient system for managing claims in building projects in Iraq

Overview of Construction Claims
Methodology of Work and Data Collection
Analysis of Existing Claims in Construction Projects in Iraq
Project B
Project C
Project D
Project E
The Resolution Methods of the Claims
Statistical Analysis and Discussion of Tabulated Answers
Contractor
Proposed of Claim Management System for Construction Projects
Management System during the Preconstruction Phase
Management System During The Construction Phase
Findings
Conclusions