Abstract
Buffer construction using bentonite pellets as filling material is a promising technology for enhancing the ease of repository operation. In this study, a test of such technology was conducted in a full-scale simulated disposal drift, using a filling system which utilizes a screw conveyor system. The simulated drift, which contained two dummy overpacks, was configured as a half-cross-section model with a height of 2.22m and a length of 6.0 m. The average dry density of the buffer obtained in the test was 1.29 Mg/m3, with an angle of repose of 35 to 40 degrees. These test results indicate that buffer construction using a screw conveyor system for pellet emplacement in a waste disposal drift is a promising technology for repositories for high level radioactive wastes.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.